STAKEHOLDER MANAGEMENT AND NON-GOVERNMENT ORGANIZATION PROJECT PERFORMANCE IN RWANDA,

A CASE OF LIGHT FOUNDATION PROJECT BY FXB RWANDA IN NYARUGURU DISTRICT.

  • IMBARWABUKEYE Isaac Master Degree in Business Administration, Project Management Option, University of Lay Adventists of Kigali (UNILAK) Rwanda
  • Denyse MUKANDOLI, PhD Lecturer, University of Lay Adventists of Kigali (UNILAK) Rwanda
Keywords: Stakeholder Management, Project Performance, Stakeholder Engagement, Communication, eedback Mechanisms, Conflict Resolution

Abstract

Effective stakeholder management is a key determinant of success in development projects implemented by non-governmental organizations (NGOs). Despite its importance, many NGO projects in Rwanda continue to face challenges in coordination, participation, and sustainability due to limited stakeholder engagement. This study examined stakeholder management and its influence on project performance, focusing on the Light Foundation Project implemented by FXB Rwanda in Nyaruguru District. Specifically, the study aimed to (i) assess the nature of stakeholder management approaches used by FXB Rwanda, (ii) evaluate the level of project performance, and (iii) analyze the relationship between stakeholder management and project performance. A mixed-method research design was employed, integrating quantitative and qualitative approaches. Data were collected from 208 respondents, including 200 beneficiaries selected through stratified random sampling and 8 key informants selected purposively. Quantitative data were analyzed using descriptive statistics, Pearson correlation, and multiple regression, while qualitative data were analyzed thematically to provide contextual insights.Findings revealed that FXB Rwanda employed structured stakeholder management practices, including stakeholder identification, communication, feedback mechanisms, and conflict resolution. Project performance was high across timeliness, quality outcomes, beneficiary satisfaction, and sustainability. Correlation and regression analyses confirmed a strong and statistically significant positive relationship between stakeholder management and project performance, with stakeholder management explaining 61% of the variation in project outcomes (R² = 0.61, p < 0.001). The study concludes that effective stakeholder management enhances NGO project performance and validates Stakeholder Theory by demonstrating that actively considering stakeholder interests throughout the project cycle improves outcomes. Recommendations include strengthening participatory engagement, formalizing feedback and conflict resolution systems, and enhancing communication strategies to sustain project effectiveness.

Author Biographies

IMBARWABUKEYE Isaac, Master Degree in Business Administration, Project Management Option, University of Lay Adventists of Kigali (UNILAK) Rwanda

Master Degree in Business Administration, Project Management Option, University of Lay Adventists of Kigali (UNILAK) Rwanda

Denyse MUKANDOLI, PhD, Lecturer, University of Lay Adventists of Kigali (UNILAK) Rwanda

Lecturer, University of Lay Adventists of Kigali (UNILAK) Rwanda

References

African Development Bank. (2022). African economic outlook 2022: Supporting climate resilience and a just energy transition in Africa. African Development Bank Group. https://www.afdb.org/en/documents/african-economic-outlook-2022

Aguek, J., & Deng, M. (2021). Challenges in humanitarian project implementation in South Sudan. Journal of Humanitarian Affairs, 6(1), 34–47. https://doi.org/10.1177/08997640211001643

Awuor, J., & Wekesa, M. (2021). Participatory monitoring and its role in community project sustainability in Africa. African Journal of Development Studies, 11(2), 55–67.

Bourne, L. (2020). Stakeholder relationship management: A maturity model for organisational implementation (2nd ed.). Routledge.

Brière, S., Proulx, D., Flores, O. N., & Laporte, M. (2021). Competencies of project managers in international NGOs: Perceptions of practitioners. International Journal of Project Management, 39(2), 168–180. https://doi.org/10.1016/j.ijproman.2020.10.004

Brinkerhoff, D. W., & Brinkerhoff, J. M. (2020). Capacity development in fragile states: Supporting sustainable development through stakeholder empowerment. Public Administration and Development, 40(2), 105–116. https://doi.org/10.1002/pad.1864

Bryson, J. M., Crosby, B. C., & Stone, M. M. (2021). Designing and implementing cross-sector collaborations: Needed and challenging. Public Administration Review, 81(1), 23–35. https://doi.org/10.1111/puar.13250

Chen, Y., & Lee, J. (2021). Stakeholder participation and satisfaction in community development: A global meta-analysis. Development Studies Journal, 58(2), 123–140. https://doi.org/10.1080/00123889.2021.112345

Creswell, J. W., & Creswell, J. D. (2018). Research design: Qualitative, quantitative, and mixed methods approaches (5th ed.). SAGE Publications.

Creswell, J. W., & Plano Clark, V. L. (2017). Designing and conducting mixed methods research (3rd ed.). SAGE Publications.

Freeman, R. E. (2020). Strategic management: A stakeholder approach. Cambridge University Press.

Freeman, R. E., Harrison, J. S., & Zyglidopoulos, S. C. (2021). Stakeholder theory: Concepts and strategies. Cambridge University Press. https://doi.org/10.1017/9781108859493

FXB Rwanda. (2023a). Annual report 2022–2023: FXBVillage implementation in Nyaruguru District. FXB Rwanda.

FXB Rwanda. (2023b). Internal project implementation report: LIGHT Foundation Project 2022–2023. FXB Rwanda.

FXB Rwanda. (2023c). Light Foundation Project report: Year one progress. FXB Rwanda.

Johnson, P., Smith, K., & Turner, J. (2022). Stakeholder identification and project risk management: A global perspective. International Journal of Development Projects, 29(1), 88–102. https://doi.org/10.1080/13504509.2022.1137456

Kerzner, H. (2022). Project management: A systems approach to planning, scheduling, and controlling (13th ed.). Wiley.

Martinez, L., & Silva, J. (2023). Stakeholder participation and sustainability of community-based projects in Sub-Saharan Africa. Sustainability, 15(4), 1876. https://doi.org/10.3390/su15041876

Mugabo, A., & Kayitare, B. (2023). Challenges in stakeholder management in NGO projects in Rwanda. Rwanda Journal of Social Sciences, 5(1), 32–47. https://doi.org/10.4314/rjss.v5i1.3

Munyaneza, P., & Uwizeye, C. (2022). Sustainability challenges in Rwanda’s livestock development programs. Rwanda Policy Review, 8(3), 45–60.

Njeri, M., & Otieno, P. (2022). Barriers to timely completion of donor-funded projects in Kenya: A stakeholder perspective. Journal of African Development Management, 9(4), 212–230.

Nguyen, T. H., Pham, L. T., & Tran, Q. M. (2022). Stakeholder analysis and project performance in development programs. Sustainability, 14(9), 5564.

Nsengiyumva, D., & Mukiza, C. (2021). The role of communication and feedback in enhancing project satisfaction: A case study of rural health initiatives in Rwanda. Rwandan Journal of Social Policy and Development, 4(2), 101–116.

Ochieng, E., Mutesa, F., & Gahungu, A. (2022). Stakeholder management practices and project performance in NGO-led development initiatives. Development Project Review, 11(4), 295–310. https://doi.org/10.1080/20421338.2022.1589634

PMI. (2021). A guide to the project management body of knowledge (PMBOK® Guide) (7th ed.). Project Management Institute.

Singh, A., & Roberts, M. (2023). A meta-analysis of stakeholder engagement and project success rates. International Journal of Project Management, 41(1), 12–28. https://doi.org/10.1016/j.ijproman.2023.01.004

UNDP. (2022). Development effectiveness report 2021/2022. United Nations Development Programme.

UNDP. (2022). Stakeholder engagement and communication handbook. United Nations Development Programme.

United Nations. (2015). Transforming our world: The 2030 Agenda for Sustainable Development. United Nations General Assembly. https://sdgs.un.org/2030agenda

USAID Rwanda. (2023). Feed the Future Rwanda Hinga Weze final evaluation report. USAID Rwanda.

Uwizeyimana, D., Habimana, S., & Nsanzimana, E. (2022). Feedback mechanisms and infrastructure project performance in Rwanda’s Eastern Province. Journal of African Development, 24(4), 376–390. https://doi.org/10.4314/jad.v24i4.5

Williams, K., O’Neill, P., & Carter, S. (2021). Conflict resolution as a driver of project performance in community-based development projects. Community Development Journal, 56(2), 215–231. https://doi.org/10.1093/cdj/bsaa048

World Bank. (2021). Project quality assurance framework for development effectiveness. World Bank Publications.

World Bank. (2022a). Community-driven development: A global review of implementation and outcomes. World Bank Publications.

World Bank. (2022b). Sustainability and development: Strategies for lasting impact. World Bank Publications.

World Bank. (2023). Development project success and failure: A global overview. World Bank Publications.
Published
2026-09-15
Section
Articles